The APIPRO Production Calendar
Module can at any time a quick
survey of planned downtime
anywhere in production at any
given time in order to optimize
repair shutdown period planning.
The module also enables
realistic man-hour calculations
of stoppage and waiting time.
Multiple production shutdown and
shift calendars can be defined
and assigned to a position in
the plant structure. The entire
branch in the structure below
the position will then
automatically be assigned to the
same calendars.

Click to enlarge
From the work order planning
system there is direct access to
see the shutdown and shift
calendars. When making work
order registrations on work
orders requested by the API PRO
Job Ordering module, the stop
time, the waiting time and the
waiting time for spare parts
will automatically be calculated
in real manned hours. This will
ensure realistic statistics on
stop and waiting times.
Take note that the Production
Calendar module has been merged
with the Job Ordering module.
See
Job Ordering for further
information on the extended
functionality.